Plan Your Project

From empty lot to grand opening — here’s your roadmap.

Step 1: Define Your Space

Measure your available area and note anything nearby: trees, fences, drainage, utilities, sidewalks. Remember that safety use zones extend 6+ feet beyond the equipment itself, so the play structure footprint is always smaller than the total space you’ll need.

Step 2: Know Your Users

Who’s playing here? Equipment is designed for specific age groups — 6–23 months, 2–5 years, and 5–12 years — and mixed-age sites often benefit from separate zones. If inclusive and accessible play is a priority (and it should be), tell us early so we can design for it from the start.

Step 3: Set a Realistic Budget

A complete project includes more than the structure. Plan for:

  • Equipment (the biggest piece)
  • Freight
  • Site work and drainage, if needed
  • Safety surfacing (engineered wood fiber, poured-in-place rubber, or turf)
  • Installation

As a rough rule, surfacing and installation together can add 40–60% on top of equipment cost.

Not sure what your budget buys? Ask us — we’ll show you options at multiple price points.

Step 4: Pick Your Surfacing

Every commercial playground needs impact-attenuating surfacing rated for the fall height of the equipment. Engineered wood fiber is the budget-friendly workhorse; poured-in-place rubber is the low-maintenance, fully accessible premium option. We quote both so you can compare.

Step 5: Plan Your Timeline

Work backwards from your target opening date. Between design, ordering, manufacturing, shipping, and installation, most projects take [X–X months] start to finish. Standard colors keep production on the fastest schedule; custom colors can add a few weeks. Ordering in fall or winter is the smartest way to guarantee a spring opening.

Step 6: Get Us Involved Early

The earlier we’re in the conversation, the more money and headaches we can save you. Free design help, free renderings, free quotes, and answers within one business day.